Rectronx Circuits
Back to Blog
Components3 min read2026-07-29

IoT Air Quality Monitor with MQ135 or BME680: FYP Reality Check

A practical explanation of what MQ135 and BME680 air quality projects can and cannot claim.

R

Rectronx

2026-07-29

IoT electronics and connected devices

A practical explanation of what MQ135 and BME680 air quality projects can and cannot claim.

Quick Summary

This guide focuses on IoT air quality monitoring. The goal is to help students choose a clear scope, build a working prototype and explain the result confidently during proposal, demo or viva.

The expected outcome is a relative air quality monitoring prototype with trend display and alerts. This is a realistic student-project target because it can be demonstrated, measured and documented without pretending the prototype is an industrial product.

Recommended Scope

Start with one clear problem, one main input and one useful output. A strong FYP is not the project with the most modules. It is the project where every module has a reason.

Recommended build flow:

  • Define the user problem in one paragraph.
  • Draw the input, controller, cloud or database, and output flow.
  • Test the sensor or software module alone first.
  • Add the dashboard, alert or report only after the core function works.
  • Keep a test table for normal, error and recovery cases.

Components and Tools

  • ESP32
  • MQ135 or BME680
  • OLED display
  • Firebase dashboard
  • alert threshold

These items are common in student projects, but the exact choice should follow the final title, budget and demo environment.

Important Accuracy Note

MQ135 is not a true CO2 sensor. Treat it as relative gas/air quality indication unless calibrated properly.

This note matters because panel members often ask about limitations. A mature answer is better than a marketing answer. Say what the system can do, what it cannot do and how you tested it.

Testing Plan

record baseline, test in different airflow conditions and avoid claiming certified ppm accuracy.

Also prepare screenshots, serial monitor logs, database records or dashboard images. These become evidence for Chapter 4 and help you answer viva questions without guessing.

Common Mistakes

  • Choosing a title before checking component availability.
  • Connecting everything at once before testing each module.
  • Ignoring power supply, wiring and environmental limits.
  • Making claims that are not supported by test results.
  • Preparing a demo but not preparing error-case explanation.

Final Advice

Use this topic as a focused project, not just a nice title. The strongest version has a clear problem statement, a small but reliable prototype, and honest testing results.

For more title ideas, browse the Rectronx Project Catalog.

If the project uses ESP32, check the ESP32 Pinout Tool before wiring.

For related modules, use the Component Database.

To discuss scope, parts and timeline, contact Rectronx.

Need Help With Your FYP?

We've helped hundreds of students complete their projects on time. Get a free quote today.

Chat with Rectronx